Correct installation of paper cone machine
As is known to all, paper cone machine has been widely applied to all walks of life, got a huge development, so the paper machine is how to install? Tongri today about paper machine installation steps for you:
A, install the preparation: paper tube, paper cone machine group to prepare technology, paper and paper tube adhesive supply work. Must be ready to technical preparation work before construction of the required tools, materials and promptly the installed mechanical equipment can be shipped to the site, unpacking inspection, disassembly, cleaning, lubrication, etc.
Second, the paper cone machine equipment out of the examination. Equipment disassembly, cleaning and lubrication.
1. paper cone machine lubrication. After the various parts of the equipment inside and outside clean, can only for lubrication. Lubricating oil must pass a test, determine the requirements before you can use. Join the equipment lubricating oil must be filtered out, the gas oil standard location should reach regulation; all part lubrication and oil hole should be filled with lubricating oil.
2. paper cone machine cleaning. After removal of equipment out of the examination, to remove rust and internal coating by residual iron, rust, and accumulation of dust and other filth in the transport, storage, clean, can be assembled.
- Pre:Paper cone machine meet the ne 2022/6/21
- Next:Introduction to a few big char 2019/12/2